BIM to FM Guide

Lifecycle Management with BIM

From a lifecycle management perspective, including facility professionals in the project management process allows for a facilities and operation perspective to be presented and considered throughout the building design and construction periods.
archibus mock

Best Practices for Using BIM in an IWMS

The process also presents an opportunity, through the model’s database, to transfer quality data that is generated at different building lifecycle phases to an integrated workplace management system (IWMS), which enables facilities professionals to hit the ground running once the building is commissioned and occupied.

But what information is needed to ensure a seamless transition from the design-build phase to operations?

Download our guide, to explore best practices in data gathering and implementation.